FIND ACTIVITIES

A.T. Corridor Boundary Maintenance--Day Mtn

Date and Time

Saturday, May 4, 2024, 9:00AM - 4:00PM

Location

AT Crossing Grange Hall Rd, Dalton MA,
Massachusetts, Berkshires,
MA

Registration

Registration is required for this activity.

Overview

Come explore the backstage of the Appalachian Trail. We'll be maintaining the critical boundary lines of the protected land corridor that surrounds the A.T. This off-trail work moves at a slow pace over varied terrain. We'll be clipping brush and painting blazes along the boundary line. Work is off-trail, occasionally in heavy brush. Expect some wet areas, too. Some stooping to clip back brush to maintain a clear line of sight along the boundary. The paint will permanently mark clothing, so don't wear your favorite trail duds. Do wear sturdy shoes that can get wet and muddy. Long pants required, long sleeves, work gloves recommended. Dress for weather conditions. Bring lunch/snacks and water to drink. Expect to spend the full day in the woods. Rain will cancel.

AMC Trip Policy

Cost

Free

Click map for driving directions
Boundary

Volunteering Type

Trail Work

Activity

Trail Work

Offered By

Western Massachusetts

Status

Open

Audience

Adults (18+)


Contact




(best time to call: day or evening)

Deb Weisenstein is a long-time member of the Massachusetts Appalachian Trail Management Committee and has served as a Maintainer Coordinator, Monitor Coordinator, Vice Chair and Chair. She has experience in long-distance hiking, trail work, and trail project management.